Car in winter

Winter Preparedness: Why the Work You Do In Fall Decides How Your Winter Goes

September 09, 2026•4 min read

Every operator knows the first hard freeze is coming. Very few of us actually schedule for it. The trouble with winter preparation is that it’s out of sight and out of mind, until it's not. Nobody notices the glycol level in the boiler tank until ground heat stops on a twelve-degree morning and ice starts building at the exit. Nobody notices the entrance tunnel heater isn’t working until they get cold and lines start freezing in the tunnel. The work is easy if you do it in October. It is expensive and urgent in December or January.

That is why we run a formal Winter Preparedness Checklist at every site, and why the deadline is November rather than "sometime before it gets cold." A floating deadline is a deadline that gets skipped. Here is what belongs on that list and why each category is important.

Heat

Heat is the category that fails first and hurts most, and it covers more equipment than most operators think about. Ground heat boilers, tunnel tube heaters, gas blower heaters in the blower room, equipment room heaters, and office heaters all need to be verified as working, with venting intact and no gas leaks anywhere in the system. Boilers deserve extra attention: check the vent piping, the relief valve, confirm there are no gas, water, or glycol leaks, and verify the glycol level is sufficient. If you find anything that fails, get it serviced quickly. Waiting until the temperature drops to service heaters and boilers may mean competing for the same technicians, and you could get put on the back burner.

Airflow and Ventilation

Your summer setup and your winter setup are opposites, and the switch does not happen on its own. Turn off vent fans, and close vents in both the tunnel and the equipment room. At northern sites, seal the equipment room vents for the season. This is an hour of work that costs almost nothing, and it is the difference between a warm equipment room and a call about frozen lines at five in the morning.

Water

Anything holding water outside the building is a liability once it freezes. Sprinkler systems should be shut off and blown out, faucet covers should be in place, and any exterior piping or backflow preventers should be properly winterized. Add one operating rule to the list while you are at it: shut off water to the mat machines any time the temperature is below freezing. In the northern markets, mesh vacuum canopies may need to come down before the snow load arrives.

Snow, Ice, and the Plow Contract

Snow removal is the item operators most often handle reactively, and it is the one where being reactive costs the most. Make sure bags of de-icer or salt are stocked for walkways, that the site has the snow shovels it needs and that they are in good repair, and that a current contract is in place with a plowing company. Signing a plow contract during the first storm of the season is how you end up paying premium rates for whoever is still available.

Your People

This category is sometimes forgotten. Jackets, beanies, and sweatshirts need to be in stock with one of each available for every employee. Shared heavy coats should be washed and ready to use. Hand and foot warmers should be stocked and available as needed, and winter work gloves should be available on site. Your crew works outside in weather your customers will not roll a window down in. Taking care of them is a retention strategy, and it shows up directly when your car wash is still operating and staffed on the coldest days of the year.

Make It a System, Not a Memory

A checklist works not because of the list itself. It is the accountability the list creates. Ours requires a pass, flag, or fail response on every item, along with photo documentation on a few of them, such as the glycol tank level and the sealed equipment room vents. That is what moves the process from "yeah, we handled it" to something that can actually be audited and verified from anywhere. It also gives you a written record when you are reviewing what went wrong after a hard winter, and a starting point for next year's list.

Build it once, assign it every year, and set the due date before you need it. Winter preparation done in October is maintenance. The same work done in December could mean an emergency repair or lost revenue.

Back to Blog